Benina International Airport — Site Works

Earthworks, excavation, grading, compaction and survey control delivered by INFINITY's own crews and heavy fleet at Benina International Airport in Benghazi, Libya.

Benghazi, LibyaUnder construction
PROJECT PROFILE

THE FULL
STORY.

INFINITY is carrying out site works at Benina International Airport in Benghazi, Libya, around the passenger terminal and the surrounding airside and landside areas.

Current activities include bulk excavation and loading, cutting and levelling with motor graders, compaction with heavy rollers, and survey control with GNSS equipment to set levels and alignments before each layer is placed.

The works are executed by INFINITY's own engineers, site crews and heavy equipment — excavators, wheel loaders, graders, rollers and haul trucks — as one accountable team, with site safety managed around an operating airport.